Bored piling is a modular system designed to recycle solid particles (coarse and fine sand) during the production of construction piling mud, as well as to purify tail water and dry-stack solid waste (mud). It has great innovations in appearance and structure.
It primarily consists of a vibrating screen, a desander or desilter cyclone, a sand pump, and a mud tank. The vibrating screen is equipped with coarse and fine screens. The coarse screen removes larger particles of slag from the mud, while the desander or desilter cyclone and the fine screen on the vibrating screen remove smaller sand particles. The closed-circuit mud purification system and the low slag moisture content help reduce environmental pollution. The North Drilling solids control equipment mud-water separation system is specifically designed for mud purification in construction projects such as slurry balancing, piling, and shield tunneling.
Model | TRZX-50/25 | TRZX-100/50 | TRZX-200/50 |
Fluid Capacity | ≤50m³/h | ≤100m³/h | ≤200m³/h |
Sludge Treatment Capacity | 10-26t/h | 20-50t/h | 25-80t/h |
Separation Point | 25μm | 50μm | 50μm |
Shale Shaker | TRZS753 | TRZS753 | TRZS705 |
Screen Area | 上层:700x1250 下层:750x900x2 | 上层:700x1250 下层:750x900x2 | 上层:750x900x2 下层:700x1250x3 |
Vibration Motor | 1.0kwx2 | 1.0kwx2 | 1.5kwx2 |
Matching Pump | TRSB4x3-12(15kw) | TRSB5x4-13(30kw) | TRSB6x5-13J(45kw) |
Cyclones | DN100x4 | DN250x1 | DN250x2 |
Tanks Dimension | 2300x1830x1300mm | 3100x2030x1300mm | 4000x2200x1300mm |
System Dimension | 2300x1830x2400mm | 3100x2030x1300mm | 4000x2300x2850mm |
Application areas: Suitable for large-diameter pile foundation projects using mud wall consolidation and circulation drilling technology, as well as various foundation engineering construction such as jacking operations, anti-seepage wall projects, and trenchless projects.
Xi'an TR Solids Control Equipment's trenchless mud recovery system and mud-water separation equipment have a wide range of applications: directional crossing projects, mud-water separation in trenchless projects, mud purification and recovery in slurry shield construction, mud purification and recovery in forward and reverse circulation drilling in hydropower, urban construction and other construction projects, and mud purification and recovery in large-diameter shafts and pile foundations.
Address: No.2 Hu·ochang Rood, Yangling District, Xianyang City, Shaanxi Province, China
Tel: +86-13186019379
Email: sales@trsolidscontrol.com
Contact: Mr.Li